Bathroom renovation showroom visit checklist Brisbane two hours
Two hours on the Loganholme floor is enough to lock a bathroom renovation selection - if the clock is planned. A bathroom renovation showroom visit checklist Brisbane two hours keeps vanity width, shower set, finish family and order notes in one walk, instead of three scattered return trips.
This is a concise timed visit plan for Brisbane and Logan renovators using Elenni in Loganholme). Pair it with the trip notes in Loganholme bathroom showroom visit from Brisbane and Gold Coast, the pre-visit questions in bathroom showroom FAQs Brisbane before you visit, the finish walk in bathroom showroom Brisbane finish matching plan, and the buy sequence in bathroom renovation product order checklist Brisbane showroom. Live hours and parking: Loganholme showroom.
Before you leave home (10 minutes)
Pack only what you will use under showroom LEDs:
- Room sketch or taped photos with millimetres for vanity width, niche depth and shower clearances.
- One tile, stone or paint offcut - not a folder of twenty swatches.
- Plumber notes on rough-in, waste position and hinge side if glass is in scope.
- Phone open on bathroom showroom Brisbane plus the FAQs above.
Read the visit companion Loganholme visit guide once for parking and approach, then drive.
Two-hour timed floor plan
Keep the clock visible. Drop the second finish family early if the first clearly fits your tile.
0:00-0:15 - Arrival, light and address check
- Confirm hours and parking on showroom.
- Stand your tile offcut under the same LEDs you will use for mixers and rails.
- Ask staff which boards hold your list categories before you wander.
0:15-0:45 - Vanity and basin lock
- Measure wall width against display cabinets; note wall-hung vs freestanding clearance to the floor and toilet pan.
- Match basin mount type to mixer height and spout reach - do not guess from phone zoom.
- Write the vanity width and basin style on your sketch before you leave this bay.
guide companions if you need them later: freestanding vs wall-hung decision notes on the vanities Brisbane page after the visit - keep this block to sizing only.
0:45-1:15 - Shower set and wet-area geometry
- Stand mixer, rail or rain head beside the same tile sample.
- Check projection, rail height and whether a second outlet is in scope for your niche.
- Note glass hinge side and floor waste access if the wet area is small.
Keep the product order sequence open after the walk via product order checklist so waterproofing still leads fixtures.
1:15-1:40 - Finish family match
- Hold mixer, shower, waste cover, robe hooks and toilet-roll holder in one finish family under the same light.
- If black is on your list, treat black and matte black as the same matte-black finish to contrast.
- Follow the timed finish blocks in finish matching plan if you still have two candidate families.
- Write SKU names, finish codes and any open questions for your plumber.
- Close any remaining pre-visit questions with showroom FAQs before you leave.
Suggested clock (Brisbane or Logan start)
- Arrive T+0 - light check and board orientation.
- T+15 to T+45 - vanity and basin sizing lock.
- T+45 to T+75 - shower and wet-area geometry.
- T+75 to T+100 - one finish family match across the set.
- T+100 to T+120 - order notes, pickup or delivery path, open FAQs.
If traffic ate the first fifteen minutes, protect the vanity and finish blocks - those are the decisions that prevent return trips.
What not to invent on a two-hour visit
- confirm WELS star counts, WaterMark licence numbers, hole centres or stock ETA days in this checklist on the live product page.
- Confirm every millimetre and compliance line on the product page.
Visit, delivery and contact
Our showroom is at Shop 4, 1 Bryants Rd, Loganholme QLD 4129 (opening hours and directions), where you can see finishes in person and collect your order free once it is ready. We also deliver Australia-wide, with the exact rate shown at checkout (see delivery and returns). Questions? Call 07 3209 9644 or send us a message.
Related reading to keep open
Loganholme visit from Brisbane and Gold Coast | showroom FAQs before you visit | finish matching plan | product order checklist | Loganholme showroom | bathroom showroom Brisbane | bathroom buying guides.
FAQ - two-hour bathroom renovation showroom visit
Is two hours enough for a full bathroom selection?
Yes when you arrive with a millimetre sketch, one tile sample and two finish families max. Use this timed plan, then deepen finish work with the finish matching plan if needed.
What should I read before I drive from Brisbane?
Open Loganholme visit notes, showroom FAQs and live hours on showroom.
When do I place the product order after the visit?
Follow bathroom renovation product order checklist so waterproofing and rough-in still lead fixtures.
Are black and matte black different finishes?
No. On this floor
Related shopping: tapware.
Related shopping: vanities.